Basement Finishing · Perinton, NY

Finishing basements around Perinton, one crew at a time

Big open basements are the norm in Perinton’s colonials off Turk Hill and Ayrault, and most of them are sitting unfinished.

Perinton has a lot of unfinished square footage sitting under it. The colonials built off Turk Hill, Ayrault, and Baird through the 80s, 90s, and 2000s came with big open basements and three-car garages, but the basement usually got left as storage. Now those same houses need a rec room, an office, or space for a kid moving back home, and the bones are already there waiting.

Most Perinton basements we go into are poured concrete, built during the colonial boom off Turk Hill, Baird, and Rt 250, with plenty of open span and decent ceiling height. That’s good news for finishing. What we find once we open walls is usually a sump pump that’s never been tested under real load, and duct or wire runs placed with no plan for a finished ceiling later. The older homes near the canal on the west end run different, often with block foundations and less predictable moisture history.

What’s included

  • Testing and sealing the slab and walls before framing starts
  • Framing out rooms sized for how you’ll use them
  • Running insulation suited for below-grade Perinton winters
  • Building code-compliant egress windows where a bedroom is planned
  • Hanging and finishing drywall with a flat, drop-free ceiling
  • Installing flooring rated for basement moisture and temperature swings

What’s different about Perinton basements

The mistake we see most in Perinton is finishing a basement before dealing with water. These colonials off Ayrault and Baird have big open slabs, and a sump pump that’s never been stress tested is common. We check the slab and walls for moisture, test the sump under real conditions, and seal or reroute drainage before any framing goes up. Skip that step and the drywall pays for it in a year or two.

One crew handles the whole basement, start to finish, no subs rotating through your house. We show up, we frame, we wire the plan around your panel and posts, we drywall and finish and install the flooring, and we clean up after ourselves every day. You get a straight price before anything gets cut. Call (585) 488-3155 and walk us through what you’re picturing for the space.

What's different about Perinton basements

How a project runs

No mystery pricing, no disappearing crews.

01

Walk-through

We measure, photograph, and talk through what you actually want.

02

Written proposal

A clear scope and one investment number, emailed to you.

03

Schedule

Start date, material selections, and a stage-by-stage plan.

04

Build & walk-out

Daily cleanup, a final walk-through, and a punch list closed out.

Notes for Perinton homeowners

Big open basements are the norm in Perinton’s colonials off Turk Hill and Ayrault, and most of them are sitting unfinished.

  • The Town of Perinton pulls its own permits separate from the county, and egress windows get inspected closely on any basement bedroom.
  • Newer colonials off Baird and Turk Hill often have three-car garages, which sometimes means the basement stair or bilco access is tucked in an odd spot we plan around.
  • Homes closer to the canal on the west end run older and can have block foundations that need more moisture work before we frame anything.
  • Rt 250 and Rt 31 corridor lots tend to be larger, which usually means more basement square footage but also more distance for utility runs.

Perinton questions

Do I need a permit to finish a basement in Perinton?

Yes. The Town of Perinton requires a building permit for finished basement space, and egress gets checked closely if you’re adding a bedroom. We handle the application and inspections as part of the job.

My house is off Turk Hill and has a sump pump already. Is that basement ready to finish?

A working sump is a good start but we still test the walls and slab for moisture before framing. Some of these 1980s and 90s colonials get damp along the back wall where grading slopes toward the house.

How long does a basement in a typical Perinton colonial take?

Most of the big open basements common in Perinton’s newer colonials run several weeks depending on how much square footage you’re finishing and whether we’re adding a bathroom or wet bar rough-in.

Start your project

Got a Perinton basement sitting empty. Call (585) 488-3155 and let’s talk about it.

(585) 488-3155

Call or text with your address and a few photos — we’ll set up a walk-through.